1.8 Exercises

  1. For each of the four case studies in Section 1/5, what sort of data is involved: time series or cross-sectional data
  2. For cases 3 and 4 in Section 1/5, list the possible predictor variables that might be useful, assuming that the relevant data are available.
  3. For case 3 in Section 1/5, describe the five steps of forecasting in the context of this project.